
Note: The source of population, dwellings and household data in this draft District Plan is from the NSW Department of Planning and Environment, 2016 NSW State and Local Government Area Population and Household Projections and Implied Dwelling Requirements 2016 to 2036. Population projections provide an indication of the size and age-sex structure of the future population if specified assumptions about future fertility, mortality and migration are realised. The projections are based on final 30 June 2011 Estimated Resident Populations (ERPs) supplied by the Australian Bureau of Statistics (ABS). Finalised ERPs incorporating the 2016 Census of Population and Housing are not expected from the ABS until mid-2018.
This Central City District Plan was prepared by the Greater Sydney Commission. It contains information, data, documents, pages and images (“the material”) prepared by the Greater Sydney Commission (the Commission).
The material is subject to copyright under the Copyright Act 1968 (Cth), and it is owned by the State of New South Wales through the Commission. The Commission encourages the availability, dissemination and exchange of public information. You may copy, distribute, display, download and otherwise freely deal with the material for any purpose, on the condition that you include the copyright notice “© State of New South Wales through the Greater Sydney Commission” on all uses.
You must, however, obtain permission from the Commission if you wish to:
To obtain such permission, please contact us at: info@gsc.nsw.gov.au.
You may publish the material to another website, however if you publish an entire document or publication, we prefer you to make a direct link to the Commission’s website to ensure that the latest version is always displayed.
This permission does not extend to copyright in the materials on the Commission’s website that are owned by others.
The Commission cannot and does not make any claim as to the accuracy, authenticity, currency, completeness, reliability or suitability of any material supplied by third parties or linked to third party sites. The Commission will not accept liability for any loss, damage, cost or expense that you may incur as a result of the use of or reliance upon the material in the District Plan or any linked sites. Please also note the material may change without notice and you should use the current material from the Commission’s website and not rely on material previously printed or stored by you.
Central City District Plan
March 2018 © State of New South Wales
through the Greater Sydney Commission
ISBN: 978-0-6482729-0-8